Recent Projects carried out by Taymor Electrical Contractors Limited:

CT Scanner Installation

A contract carried out for Stonebridge Construction Limited completed in march 2002.

The installation involved the conversion and extension of an existing building to facilitate the installation of a new £500,000.00 CT Scanner.

The installation was carried out mainly out of hours working, due the fact that the area involved, had to be kept up and running as a busy X ray Department.

The Mains incomer to the CT Scanner was carried out utilising 70mm XLPE/SWA LSF cables run within the existing ceiling void on a containment system of galvanised steel cable trunking.

With final connection via a contactor controlled 160Amp main switch, with an emergency stop circuit connected to the contactor.

The lighting installation was carried out utilising recessed HF 600 x 600 cat 2 luminaires, and recessed HF downlights.

A system of analogue addressable emergency luminaires has been installed to facilitate the testing of the emergency luminaires via a computer.

The existing fire alarm installation was extended to the new CT scanner suite.

A stand alone nurse call system has been installed wired in a containment system of galvanised steel, trunkings and conduits.

Stalybridge Civic Hall

A recent £100,000.00 electrical installation completed in 2001.

The installation consisted of the existing Victorian market hall being converted into a new civic hall, complete with offices, conference suits and meeting rooms.

Many of the existing features of the building had to worked around due to the fact that it was a listed building by the English Heritage.

The whole of the installation has been carried out utilising a system of 6242Y twin and earth type cables installed on a containment system of galvanised steel cable trunkings installed with the ceiling voids.

The whole of the lighting installation was hi-spec and consisted of HF recessed brass PL downlights and HF recessed Cat 2 luminaires to all office areas, and cold cathode lighting within the conference room.

Suspended brass maintained exit luminaires were installed to all meeting and conference rooms.

A new analogue addressable fire alarm system was installed complete with repeater panels to the whole of the building.

Other works included small power installation, intruder alarm installation, lightning protection, external security lighting, mains distribution and metering, emergency lighting.

The main contractor was Dew Pitchmastic Limited and the Client was Tameside Metropolitan Borough Council.

Pilgrim International Ltd.

A new build industrial manufacturing unit built by West Construction Limited and completed in 2001 with a electrical contract value of approx £70,000.00.

The installation consisted of new Mains & sub mains distribution, warehouse lighting and power, office lighting and power, fire alarms, emergency lighting, external lighting, electric heating and machine wiring.

The whole of the works was carried out utilising 6491X single core copper cored singles cables installed within a containment system of galvanised steel trunkings and conduits.

Other Projects Carried Out By Taymor Electrical Contractors Limited Include:-

 

Client Project Details. Approx. Value.

OMBC. Counthill School, Oldham. £300,000.00
Complete Rewire.

OMBC. Oldham Civic Centre. £100,000.00
Refurbishment.

British Aerospace Nimrod Hanger Bay £100,000.00
New offices
 
 
Dew Construction. Early Learning Centre, Swindon. £200,000.00
Ltg, Pwr, Fire Alarm, AIC Wiring.

Dew Construction. BMW Dealership, Warrington. £120,000.00
Complete Electrical Installation.

NHS Trust J. Block, Royal Oldham Hospital £200,000.00
Pwr, Nurse call, static systems.

Cable & Wireless Refurbishment of offices £250,000.00
& Communication centre.
     
Dew Construction. Sefton Pharmaceuticals, Guernsey. £100,000.00
New factory and offices.

West Construction. Ramada Hotel, Manchester. £80,000.00
Refurbishment of hotel.

Dew Construction. TDG Beck & Pollitzer. £100,000.00
Warehouse Complete Electrical Inst..

Dew Construction Bertram Faure, Swindon. £100,000.00
Complete Electrical Installation.

Dew Construction Europa Court, Warrington. £75,000.00
Offices & Warehouses.

NHS Trust Accident & Emergency ROH. £75,000.00
Complete Electrical Installation.

Barnes Construction Eccles Bus Station. £100,000.00
Complete Electrical Installation.

First Bus Huddersfield Bus Depot. £30,000.00
Refurbishment.

Railtrack Various Contracts. £100,000.00
Throughout the country.

Williams Tarr Sharston Ind Unit. £30,000.00
Complete Electrical Installation.

West Construction CRP Marine, Skelmersdale. £40,000.00
New office installation.
     
Naylor Walkden Booth Hall Hospital. £30,000.00
  New Burns Unit.  

 